The 25-point handover checklist
What to inspect on key-collection day, and what to leave for the snag list.
By Karan Desai12 March 20266 min

Key collection is not the end of the buying process. It's the start of a 60-day window where the developer is contractually obligated to fix defects.
Before you arrive
- Bring the Sale Agreement, brochure, and floor plan
- Bring a phone with full battery and a measuring tape
- Allocate at least 3 hours
What to inspect
Structural and external
- Cracks on walls and ceiling
- Water seepage around windows
- Door alignment and locking mechanism
- Window operation and weatherproofing seal
- Floor level (use a ball, it shouldn't roll)
Electrical
- Every switch and outlet
- Light fixtures
- Power distribution box labeling
- AC point provisioning
Plumbing
- Every tap (cold + hot)
- Drains in all bathrooms + kitchen
- Geyser power and water supply
- Water pressure in upstairs bathrooms
Kitchen
- Cabinet alignment and hinge quality
- Sink drain
- Chimney exhaust
- Modular fittings if included
Bathrooms
- Tile alignment
- Sanitaryware fittings
- Exhaust fan operation
- Drain slope
Finishes
- Paint quality and uniformity
- Floor polish / vitrified tile cracks
- Skirting alignment
- False ceiling if installed
After the inspection
Submit a written snag list with photos. Get the developer's site engineer to sign on receipt. Follow up weekly. Most snag items are resolved within 30 days; structural items may take 60.